Nuclear grade resin for coolant chemistry and condensate polishing

Nuclear-grade resins meeting the highest published specifications for coolant chemistry and condensate polishing.

Nuclear Power

XRESIN nuclear grade ion exchange resins are designed exclusively for nuclear power service and backed by a full technical support team. The nuclear grade line meets the highest published quality specifications demanded by the nuclear industry worldwide and allows plants to address every area of water purification within their operations.

Nuclear systems have requirements beyond conventional power duty: highly regenerated resin to maintain high-purity make-up; specialty nuclear resins for chemical control of coolant, protecting fuel and addressing the isotopes present; high-capacity resins for extended service life when polishing boiler water; and extremely low-residual organic chloride and sulfate release forms to avoid introducing condensate contaminants while still removing corrosion by-products.

We partner with operators to optimise savings, continually develop products and services, and seek methods to reduce operating costs. Our specialists provide application, resin and system modification assistance throughout the fuel cycle.

Request a Quote

Tell us about your application and stream conditions — our technical team responds within 24 hours.

Request a Quote

Frequently asked questions

Which documents should I request for nuclear grade resin?
Ask for the certificate of analysis, leachable and chloride/sulfate data, conversion rate, and radiation stability information. Confirm the specification your plant requires before ordering.
Can the resin be regenerated in a nuclear loop?
Regeneration is possible where the plant permits it, but quality risk rises with handling. Many operators prefer replacement or external regeneration to keep leachables and cross-contamination under control.
What is the lead time for nuclear grade resin?
Lead time depends on grade and required documentation. Send your specification and quantity to get a confirmed schedule before committing to a project timeline.