Responding to fast-growing demand for battery-grade lithium, we have commissioned a pilot production line for lithium-selective adsorbent media at our Suzhou facility.
The new line is designed for direct lithium extraction (DLE) duty, offering a faster, more compact alternative to multi-year evaporation ponds, with a smaller land footprint and far less salt waste.
Evaluation samples are available for client brine chemistry; our engineers support cycle design and scale-up testing.